Digital Twin
The coordinated model, carried on into the life of the building.
Digital Twin
The building, run from its model.
The model coordinated for design and construction carries on after handover, as the working record of the building for the people who operate it.

- 01
One model, design to operations
The coordinated BIM model is not left at handover: it carries on into facility management, so the building is run from the information it was designed and built from.
- 02
Facility-management handover
Assets, systems and their data are handed over with the model, ready for the people who operate and maintain the building.
- 03
Linked to programme and cost
The same model carries the 4D programme and the 5D cost plan, so time and money are read from one source.